
Eddie Treviño, Jr.
County Judge
For Immediate Release
May 16, 2025
Contact: Eddie Treviño, Jr.
Temporary and Intermittent Road Delay of a Portion of State Highway 4
Please be advised that on May 21, 2025, SpaceX will be conducting Texas Department of Transportation (TXDOT) approved transportation operations on Highway 4 from the factory to Massey’s sometime between 12:00 p.m. – 4:00 p.m. or from 10:00 p.m. – 4:00 a.m. (May 22, 2025) of the following day. The transport will take approximately 2 hours. The beach and highway will remain open throughout the operation; however, traffic may be delayed for a short duration.
###